Light Steel Structure Prefab Industrial Building Warehouse Workshop Hangar
Description
Basic Info.
Model NO. | TW-KA131 |
Window | Aluminum Alloy Window or Plastic Steel Window |
Surface Treatment | Painted or Galvanized |
Wall and Roof Sandwich Panel | EPS, Rock Wool, Glass Wool, PU |
MOQ | 200m2 |
Main Frame | H Section Steel, C, Z Section Steel |
Design Parameter | Wind Load, Snow Load, Earthquake |
Size | Designed as Per Customer′s Requirement |
Transport Package | Common Package |
Specification | Q235B, Q345B |
Trademark | TW |
Origin | Qingdao, China |
HS Code | 9406900090 |
Production Capacity | 2000 Ton/ Year |
Product Description
Project DescriptiomAdvantages of steel structure building1.Good plasticity and toughness of steel. The steel structure will not suddenly break down due to accidental overloading or partial overloading. Good toughness makes the steel structure more adaptable to dynamic load. These properties of steel provide adequate assurance for the safety and reliability of steel structures.
2.Safety and High Accuracy
The components are transported to the field, assembled by bolts, and the structure is light, so the construction is convenient and the construction period is short. In addition, the steel structure building is easy to disassemble, reinforce or rebuild.
3.Light Weight ,Fast Installation and Low CostThe total weight of the building is light, the steel structure of the building system is light weight, about half of the concrete structure, can greatly reduce the basic cost.The construction speed is fast, the construction period is shorter than the traditional residential system at least 1/3, so the comprehensive cost can be reduced, and the comprehensive cost is reduced by 5%. Accelerate capital turnover, greatly improve investment efficiency.4.Environmental protection. The steel structure building will greatly reduce the sand, stone, ash content, the materials used are mainly green, Recyclable or degradable materials,most of the materials can be recycled or degraded, will not cause a lot of waste.
Project Details
Main frame | ||
1 | Main steel structure ( columns and beams ) | 1 . Steel Q345 ( S355JR ) or Q235 ( S235JR ) H shape2 . Straight cross-section or Variable cross - section |
2 | Sub steel structure | 1 . Material Q235 ( S235JR ) steel2 . Bolt connections . Anti-rust painted or galvanized .3 . Bracing :X - type or V - type or other type bracing made from angle , round pipe , etc4 . Purlins : C or Z type : Size from C120 ~ C320 , Z100 ~ Z200 |
Maintenance system | ||
3 | Roof | Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile |
4 | Wall | Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile |
Doors | Steel rolling shutter or others | |
Windows | Alu. Alloy window , or others | |
Fitting | ||
7 | Edge Cover | Steel sheet 0.5mm thickness |
8 | Bolts | M24 , M22 , M16 embedded bolts , intensive bolts , galvanized ordinary bolts , high-strength bolts , etc |
9 | Others options | Day - lighting panel , Roof ventilator , Down pipe , Galvanized , Crane , sanitary Products , etc |
10 | Foundation | Cement and steel foundation bolts |
Process & Installation
Delivery & Payment
1) Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)2) Delivery time: 15~30 days after receiving the deposit and according to the order amount
About Us
FAQ
1.How about the cost of prefabricated building?
Yes, compared with concrete buildings, assembly buildings are lighter in quality and more economical. Factory production to reduce the labor intensity and time of the installation workers at the construction site.
2.How long is the service life of the portal H-type steel frame?
The service life of the main steel frame can last for 50years.
3.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)
4.What is the advantages of the steel frame compared to the traditional building?
The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.
5.How can I assemble the portal H-type steel frame?
All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.
Our Contact